Requirement: N.4 System Lifetime

Attributes
Created Thursday, November 19, 2009 at 08:29:50 PM
Creator University User
Description The OTEC plant shall be designed to operate over a forty-year (40) period with appropriate system, subsystem and component level maintenance performed over the life of the system.
Key Performance Parameter false
Last Modified Saturday, November 21, 2009 at 01:46:05 PM
Number N.4
Origin Originating
Paragraph Title Non-Functional Requirements
Type nil
Relationships
basis of Function 0 Operate OTEC System
Function 2 Generate Power
documented by Document Requirements, Codes, Standards, and Regulations
specifies Component 2 Cold Water Pipe
Component 7 Hot Water Pipe
Component 8 Turbine
Component 9 Water Pump