§5.4.3 Develop Schedule
–The K-Opt
and Insertion method are very close in score.
Both will be developed
and continuously evaluated as the K-Opt is more flexible and robust while the Insertion has the potential to be
more exact
–Dependant on
the solution space vs. runtime vs. exactness